Explore our newest data center, SC1.
Summary
Class A industrial park spanning 868 acres with 250 acres available for development.
Power
230 kV transmission line.
Utilities
Ample water, 4MPOE, dark fiber (288 ct. and up) with scalable pathways to higher-count industry-standard capacity, plus yellow and red zones with built-in expandability to support evolving high-density workloads.
Design
90% completed for Phase 1A & B.
(8) Phase 1A & B, Phase 2
One single-story building, and one two-story building.
(7) Dedicated Substation
Powering phase 2.
(9) Phase 2
One two-story building.
(10) Phase 3
Six two-story buildings.
Strategic Location
SC1 is positioned near the Myrtle Beach Cable Landing Station and key long-haul U.S. fiber corridors delivering global and national reach from Day 1.
Robust Infrastructure
Located within an industrial park, equipped with an existing substation, and 230kV transmission line, our fiber-rich design ensures diverse, scalable, and high-performance connectivity.
Timely Delivery
Phase 1 (100 MW) is targeted for delivery in Q2 2026.
Phased Growth
Clearly defined roadmap scaling from 650 MW with potential for scaling to 2.2 GW in phases.
AlfaTech
Design & MEP firm leading the Construction Documentation phase for March 2025 completion.
Holder Construction
Delivering preconstruction services, committed to full construction.
T5 Data Centers
Partnered for critical facility management services.
Transaction Experience
Over $40 billion in combined executive deal value.